Concept Page

Jawaharlal Nehru National Urban Renewal Mission (JNNURM)

Jawaharlal Nehru National Urban Renewal Mission is a government initiative to improve urban infrastructure. It aims to create sustainable cities, with a focus on basic services like water and sanitation. Launched in 2005, it has funded numerous projects.

Jawaharlal Ne​hru National Urban Renewal Mission (JNNURM) was a centrally‑funded, multi‑sectoral programme launched on 25 December 2005 by Prime Minister Manmohan Singh to accelerate the provision of basic urban services and to catalyse reforms in municipal governance across India’s rapidly expanding cities. By earmarking a total outlay of ₹ 1.35 lakh crore for the 2005‑2014 period, the mission sought to create “sustainable, livable, and inclusive” urban spaces, a goal that set it apart from earlier ad‑hoc schemes limited to single‑sector investments.

Origins and Legislative Framework

The mission emerged against the backdrop of the 2001 Census, which recorded that 27.8 % of India’s population lived in urban areas—a share projected to exceed 40 % by 2030. Recognising that existing municipal finances and capacities could not meet the impending demand for water, sanitation, and transport, the Ministry of Urban Development framed JNNURM as a flagship of the 12th Five‑Year Plan (2012‑2017) and secured parliamentary approval through the Urban Development Ministry (Finance) (Amendment) Act 2005.

The scheme was named after India’s first Prime Minister to underscore its nation‑building ethos, and it was formally administered through the newly created State Urban Development Missions (SUDMs), which acted as intermediaries between the central government and Urban Local Bodies (ULBs). The legal framework mandated that each participating city submit a “City Development Plan” vetted by the Ministry of Urban Development before accessing central assistance.

Mechanism and Funding Structure

JNNURM operated on a cost‑sharing model that differentiated between water‑sanitation projects (60 % central, 40 % state) and other components such as urban transport and housing (90 % central, 10 % state). Phase I (2005‑2010) allocated ₹ 60 000 crore, while Phase II (2010‑2014) added ₹ 75 000 crore, bringing the cumulative commitment to ₹ 1.35 lakh crore.

Funding flowed from the central budget, supplemented by concessional loans from the World Bank (US$ 1.2 billion) and the Asian Development Bank (US$ 800 million). State governments contributed their share directly to ULBs, which were responsible for project identification, tendering, and execution. A dedicated JNNURM Monitoring Cell within the Ministry tracked disbursements, while an independent audit panel reviewed compliance with the 60:40 and 90:10 ratios.

Key Components and Targets

The mission set quantifiable targets: provision of 100 litres per capita per day (lpcd) of piped water to 100 million urban residents, sewerage connections for the same population, and 100 % collection of solid‑waste generated in participating cities. In transport, JNNURM aimed to introduce Bus Rapid Transit (BRT) corridors in at least 30 cities and to upgrade or extend metro networks in five metropolitan areas.

A parallel “Housing for All” component earmarked funds for the rehabilitation of 2 million slum households and the construction of affordable housing for an additional 1 million low‑income families. Capacity‑building measures included the rollout of e‑governance platforms in 150 ULBs, the establishment

    Jawaharlal Nehru National Urban Renewal Mission (JNNURM) — UPSC Concept | TheKnowledgeOrbits